Kathmandu: Ambassador of Nepal to India, Dr. Shankar P. Sharma, visited the Dodhara Chandani–Banbasa Integrated Check Post (ICP) and the Darchula Bridge.
During the visit, it was informed that construction of the ICP is expected to be completed within the next two years, while the Darchula Bridge is already ready for operation. Both infrastructure projects have been constructed with the assistance of the Government of India.